Saturday, March 28, 2009

Project: The Bedroom Window

We disagreed on almost everything about the window. The original sashes were pretty rotten and he wouldn't let me epoxy/sand/paint them. Instead, he built me a whole new window from scratch (I made him stay as historically accurate as possible), and moved the whole thing to the left by 10 inches to allow for better house siding installation and water-proofing. We bought fancy new pulleys and window hardware from houseofantiquehardware.
(Drumroll........)
TA-DAH!!

(Before the final picture rail trim and the extensive painting that took place)
Total time: 1 year. Yes, 1 year with a gaping hole in the wall...

No comments:

Post a Comment

LinkWithin

Related Posts with Thumbnails